Installation
This information only applies to participants in the pilot project in Sweden.
The installation is carried out by our partner. The process consists of two phases: first, the preparation and approval from the grid operator, followed by the installation day itself.
Grid Approval Completed - Phase 2 begins

The installation is carried out by Transtema Charge, our installation partner. They will contact you when it is time for your installation, and you can discuss any practical questions directly with them, including what solution is best suited to your specific situation.
A standard installation includes the bidirectional charger (Ambibox) mounted on a wall, an edge computer (mini computer) installed near the electricity meter cabinet or distribution board, up to two Shelly meters, one network switch, up to 15 metres of power cable between the electrical distribution board and the charger, up to 15 metres of data cable, commissioning of the service, and submission of the pre-notification to the grid operator.
The following are not included and will be quoted separately: excavation work, trenching, concrete drilling, modifications to the electrical installation, network infrastructure or property, cable runs exceeding 15 metres, and upgrades to the main fuse/service connection.
As a pilot participant, you are responsible for ensuring that an internet connection is available at the installation site. The power cable refers to the electrical cable running from the distribution board to the charger, while the data cable refers to the network cable (a standard Cat5e/Cat6 Ethernet cable). The required cable size for the power cable is determined by the installer based on the power requirements.